Common areas renovation
How to choose a common areas renovation contractor in Cyprus
What a management committee can verify about a common areas contractor in Cyprus, what a comparable quote itemises, and the warning signs worth acting on.
8 min read

Marina covers hotel, office, retail and restaurant refurbishment, where the binding constraint is rarely build time. In Cyprus it is occupancy: rooms are full from April to October, so the programme decides the cost more than the rate does.
Published
A common areas renovation is not bought by a client. It is bought by a committee acting for owners who did not all vote the same way, out of a fund most of them think is too small. Alongside competence, the committee needs a contractor whose paperwork will survive being read by a sceptical owner at the next general meeting. Four things can be established before anything is signed: that the company exists as a legal entity, that its contractor registration covers works of this value, that its insurance covers third parties in a building people live in, and that it has completed comparable blocks nearby on the dates it promised.
What can actually be verified
The company. The Registrar of Companies is a public register: legal name, registration number, incorporation date and standing. The name on the quotation and the name on the eventual invoice should match, because that is the name the committee would have to sue.
The registration class. Building and technical works contracting in Cyprus is a registered activity, granted by category and by class, and the class limits the value of works a contractor may lawfully undertake. Repainting a stairwell sits inside a modest class; a full common parts programme with lift lobby, electrical distribution, water tanks and facade repair taken as one contract may not.
Insurance in force. Public liability and employer's liability, current on the dates of the works. Common areas work differs from work inside a unit because the public passes through it daily. Scaffold in a stairwell and a wet terrazzo floor are the two most common injury points on these jobs, and the committee should see the cover before it accepts the price.
Delivery against a date. The most useful reference is two blocks of similar age in the same district, with the date contracted and the date achieved, and the name of whoever chaired that committee.
Registrations that matter
The registration that governs this work is not the contractor's. It is the building's. Under the law on jointly owned buildings, works to the common parts are commissioned by the management committee under a resolution of the general meeting, and the cost is apportioned between owners by their registered share. Three practical consequences follow.
First, the authority to sign has to exist before the contract does. A committee that instructs work without a resolution covering it exposes its members personally and gives any dissenting owner an argument for not paying. The resolution required and the majority it takes are set by the statute and by the building's own regulations — a question for the committee's lawyer rather than for the contractor.
Second, the apportionment is a matter of record rather than of fairness. Shares are registered with the Department of Lands and Surveys, and a committee that apportions by floor area, or per unit, or by whatever seemed reasonable at the time, has created a dispute that surfaces when the first owner refuses to pay.
Third, the boundary between common and private has to be settled in writing before scope is drawn. Balconies are the perennial argument in Cypriot blocks: the slab and the structural edge are usually common, the surface finish and whatever the owner has enclosed usually are not, and the answer for a specific building sits in its title documents.
Permits follow the usual chain. Redecoration, relighting, new floor finishes and like-for-like replacement of common services engage nothing. Structural repair, external thermal insulation, changes to escape routes, a new lift shaft or enclosing an open ground floor require drawings certified by an ETEK-registered engineer or architect, then planning permission, a building permit and a certificate of final approval. The application is made for the building, so the committee is the applicant and needs the resolution to prove it.
VAT belongs on the quote as a separate line with the rate applied stated. The rate depends on the building, its use and its history, and a quote leaving it implicit is a quote whose total the committee does not yet know.
Questions to ask
What condition survey sits behind the price?
Concrete spalling, reinforcement corrosion, waterproofing failure and water tank condition are the four items that turn a decoration budget into a structural one. A price given from a walk through the lobby is a guess.
How will residents use the building during the works?
One stairwell, one lift, prams, wheelchairs and refuse. Access and phasing are the cost driver on occupied blocks, and a contractor who has not asked has not priced them.
What is the rate for what the strip-back reveals?
Nobody knows the extent of concrete repair until the render comes off. The honest answer is a stated rate per square metre beyond the surveyed quantity, agreed in advance.
How are variations priced, and who may instruct one?
A single committee member agreeing something with a foreman commits every owner in the building. Name one signatory and put it in the contract.
What has been completed nearby, and at what address?
Addresses rather than photographs. A contractor working a district regularly will have several within a short drive.
Where the building stands changes the specification more than the finish does. Across the older Nicosia suburbs, Strovolos among them, the stock is 1970s to 1990s and rewiring and replumbing dominate renovation work — on those blocks the common electrical distribution and riser plumbing are the real project, and the paint is what the owners see. In central Limassol, rapid high-rise development has made balcony waterproofing and facade maintenance the recurring common parts expense. On the Kato Paphos seafront, salt-laden air makes galvanised and marine-grade fixings standard rather than an upgrade, and ordinary fixings on handrails and balustrades there are cheaper for a reason that shows within two seasons. On the hillside plots above Peyia, access roads limit crane and delivery vehicle size, which decides whether the facade is reached by scaffold, mast climber or rope access — a cost line, not a detail.
What a good quote looks like
Those figures load from the price index rather than being typed into this article, so they do not go stale. The band runs from roughly €180 to €560 per square metre of common area with a mid-point near €310 for stairwells, lobby and lighting. Two other published ranges matter when building a budget: whole-block programmes covering common areas and the envelope run €3,200 to €11,000 per unit with a mid-point near €5,800 — the figure to divide by share and put in front of owners — and facade work alone €55 to €175 per square metre for render repair, coating and balcony edge detail.
A comparable quote contains:
- Preliminaries, itemised. Access equipment and its hire period, protection of the passenger lift, temporary lighting, waste removal, supervision, insurance. Access is often the largest single line and belongs in the open.
- Concrete repair priced as a rate, with a surveyed quantity and a stated rate for anything beyond it.
- Services separated from finishes, so the committee can see what is replacement of ageing distribution and what is decoration.
- Provisional sums flagged with the specification each assumes — light fittings, entrance door, letterboxes, floor finish.
- Exclusions written down, and the permit position stated, including who appoints the engineer where certified drawings are needed.
- VAT shown separately, with the applicable rate stated.
- Payment tied to verifiable stages, never to calendar dates, and paid from the common fund rather than by individual owners.
- Retention and a defects period, with the percentage and length written in.
- A signed contract in the name of the committee, not an accepted email.
The same written scope should go to every contractor invited to price. Three quotes built on three different assumptions are three different jobs, and a committee comparing their totals is comparing nothing.
Warning signs
A large payment demanded before anything happens on site, with no invoice and no stage attached. On a common fund this is worse than on a private job, because the money belongs to owners who did not authorise it.
A quote materially below the others. The gap is usually access equipment, concrete repair quantity, or a provisional sum nobody could build to — and on a facade the correction arrives once the scaffold is up and the committee has no leverage left.
An offer to price without a condition survey, or a refusal to quote a rate for repair beyond the surveyed quantity.
Willingness to take instructions from an individual owner rather than the committee. Every one of those instructions is unbudgeted.
An offer to begin structural repair or external insulation before consents are through, and a price that falls if the invoice is skipped — that discount is the building's VAT position, evidence and recourse, sold back at a discount.
Common questions
Who signs the contract, the committee or the owners?
The management committee, acting under a resolution of the general meeting, and the contract should name it in that capacity. Individual owners are not parties to it, which is why the resolution has to exist before the signature and why its scope should match the scope in the contract.
How is the cost split between apartments?
By registered share, as recorded with the Department of Lands and Surveys, not by floor area or per unit unless the shares happen to work out that way. Committees that discover this after issuing demands spend longer unwinding it than they would have spent checking.
Is a ground-floor owner liable for lift or roof works?
Liability for common parts follows the registered share rather than use, and the building's own regulations may modify how particular expenses are allocated. It is settled by reading the building's documents, not by negotiation at the meeting.
When is the best time to do this work?
Autumn and spring for external work. Cypriot summer heat limits what can be applied to a facade in the middle of the day; midwinter rain interrupts render and coating. Internal stairwell and lobby work runs at any time.
How many contractors should be asked to price?
Enough to expose an outlier, which usually means three working to one written scope. Availability constrains that in some districts more than others — thirteen companies are currently recorded with common areas renovation among their activities across Nicosia, Limassol, Larnaca and the Famagusta district, with none recorded in Paphos, so a Paphos committee is likely to be pricing with general contractors and should read the registration class carefully.
Contractors with verified registrations
8 companies shown here.
Vegghera Management
Protaras, Famagusta
Vegghera Management is a property management in Protaras, in the Famagusta district.
Fox Properties
Strovolos, Nicosia
Fox Properties is a property management in Strovolos, in the Nicosia district.
D. Zavos Group
Limassol Centre, Limassol
D. Zavos Group is a property management in Limassol Centre, in the Limassol district.
Premier Property Management Ltd
Protaras, Famagusta
Premier Property Management Ltd is a property management in Protaras, in the Famagusta district.
ElloCyprus
Paralimni, Famagusta
ElloCyprus is a property management in Paralimni, in the Famagusta district.
Superstay Rentals
Paralimni, Famagusta
Superstay Rentals is a property management in Paralimni, in the Famagusta district.
ElloCyprus
Paralimni, Famagusta
ElloCyprus is a property management in Paralimni, in the Famagusta district.
Epinal
Strovolos, Nicosia
Epinal is a property management in Strovolos, in the Nicosia district.
Sources
- Department of Lands and Surveys — property and share registration — retrieved 2026-07-24
- Department of Registrar of Companies and Intellectual Property — retrieved 2026-07-24
- ETEK — Cyprus Scientific and Technical Chamber — retrieved 2026-07-24
- Department of Town Planning and Housing — retrieved 2026-07-24
- Tax Department — VAT — retrieved 2026-07-24
01More on this topic
Same cluster.Different question.
Where to go next
Companies, districts and the rest of the guides on this subject.

Thinking of doing this?Get up to five quotes, free.
Tell us about the property and we will gather quotes from contractors who plan around the season.
